投资组合

能力:

老板: 台塑集团
项目: 更换EDC Piperack防火材料
工程师: 台塑集团
总承包商: 申博sunbet
项目类型: $1,800,000.00

项目描述

演示和更换管架结构防火.

执行工作
  • 支架安装
  • 防火演示
  • 底层结构钢的爆破及表面处理
  • 安装环氧防腐系统
  • 车床和角珠安装
  • 根据制造商的规范进行防火安装
  • 密封表面处理
成就

Mirage was contracted to replace old and deteriorated fireproofing in order to protect this critical 管 rack structure.

挑战

Our expert scaffold builder’s abilities were tested on this project! Working in and around live lines, valves, pumps, etc in the running unit made the task challenging. Furthermore, our client required 100% containment of any dust / debris created in the demo phase. Mirage was able to work closely with our client and accomplish this project successfully with a great finished product.

能力:

老板: 台塑集团
项目: LDPE混凝土上部结构,沟槽和区域铺装
工程师: 台塑集团
总承包商: 申博sunbet
项目类型: $2,300,000.00

项目描述

Mirage was contracted by 台塑 for this very urgent project due to our reliability and efficiency. This critical structure had a very tight schedule, 120 days start to finish. The three tier concrete superstructure was constructed atop large concrete footers tied into 60 foot driven concrete piles. In order to accommodate the high pressure piping this structure would house, 工程师要求水平和铅垂线低于1/16 ". The high pressure piping was affixed to the structure via > 200 meticulously placed steel embed plates that were poured monolithic into the columns and beams.

执行工作
  • 布局
  • 桩截
  • 材料采购及安装.
  • 模板/支撑EPC
  • 现浇混凝土柱和梁
  • 现浇混凝土沟槽及附件
  • 混凝土铺路
成就

This project was 100% self-performed, completed on time, and QA/QC was flawless.

挑战

加速进度和非常精确的QA/QC要求.

Other contractors outside of our contract working in the area made coordination outside of our firm critical in order to meet schedule requirements.

Form package and shoring engineering and material procurement had to be expedited to make this project successful.

能力:

老板: 台塑集团
项目: EHS承包商停车场,道路和TxDOT入口通道
工程师: 台塑公司/城市工程
总承包商: 申博sunbet
项目类型: $1,450,000.00

项目描述

道路工程和停车场由1,038,500平方英尺的粉煤灰稳定路基, 压实粉煤灰基础, 和芯片密封. Mirage was also contracted to EPC TxDOT acceleration and deceleration lanes tying into the busy highway.

执行工作
  • 布局
  • 一个航向片密封
  • 道路和停车场条带
  • 在道路上有一个跑道芯片密封
  • TxDOT入口通道的基础工作
  • 2″热拌沥青路在入口处超过1道切屑密封
  • 交通管制
  • 停车场和入口通道条纹
成就

Our client depended on Mirage to install this parking lot and road work in order to accommodate the large workforce accompanying the $5 billion dollar expansion.

挑战

Working with TxDOT as well as the end user ensuring all parties were satisfied.

能力:

老板: 台塑集团
项目: HDPE-3通路及工地工程
工程师: 台塑集团
总承包商: 申博sunbet
项目类型: $900,000.00

项目描述

海市蜃楼被台塑公司承包清理, 调查, 年级, 在未开发的地方排水. Roadwork consisted of 333,000 SF of lime stabilized sub年级, limestone base, 和芯片密封. The newly installed roads held up wonderfully as Mirage then trucked in 16,492吨石灰石铺设堆场安装材料.

执行工作
  • 布局
  • 场地清理  
  • SWPPP  
  • 排水  
  • 现浇混凝土顶墙  
  • 石灰稳定  
  • 石灰石底座安装并压实  
  • 在道路上有一个跑道芯片密封  
  • Geogrid and limestone placement and compaction at laydown yards 
成就

This project was critical due to the entire expansion depending on the safe, 适当的, and timely installation of the siteworks for other trades to mobilize and begin work on this portion of the 5 billion dollar expansion. 海市蜃楼自行完成了这个项目的各个方面. 

挑战

Completion of the job within allotted timeframe to prevent delaying the unit construction activities.

能力:

老板: 台塑集团
项目: LDPE主控制室
工程师: 马樱丹属工程
总承包商: 申博sunbet
项目类型: $3,983,476.00

项目描述

海市蜃楼与台塑签订了20台电子产品的EPC合同,000 SF blast proof control room with a steel frame and 8” thick custom precast concrete panels.

执行工作
  • 工程和结构分析
  • 场地清理
  • 开挖及石灰稳定
  • 电气接地电网
  • Cast in place concrete building foundations, 年级 beams, and floor slab
  • 所有钢结构部件的采购和安装
  • 钢板放置和尼尔森螺柱焊接
  • 所有防爆墙板的采购和安装
  • Procurement and installation of electrified blast proof doors and windows
  • 搭建屋顶系统
  • 杂项钢埋地、梯子、门平台、台阶等.
成就

在预算范围内按期完成项目. Project required heavy correspondence and cooperation between the owner and our firm. 这一切进行得顺利而有效, as all of the owner’s needs and requests were met in a timely and effective manner.

挑战

同时处理工作的几个方面. Superior coordination and communication were vital to the success of this project.

能力:

老板: 七叶树的合作伙伴
项目: 科珀斯克里斯蒂坦克场
工程师: 工程 & 终端服务
总承包商: 七叶树的合作伙伴
项目类型: $1,126,862.00

项目描述

Mirage was contracted by 七叶树的合作伙伴 to install the firewater loop at their new LPG holding facility.

执行工作
  • 制作和安装4,150 L.F. 地下管
  • Installed all fire monitors, fire hydrants, and firewater stations
成就

Effectively completed project with no OSHA recordable incidents or lost time accidents.

挑战

Working project in zones in order to facilitate owners demands for zone start up of plant.

能力:

老板: 托克公司
项目: 乔治西码头
工程师: Govind发展
总承包商: 托克
项目类型: $1,387,962.00

工程描述

Mirage was contracted by 托克 to install piping and their new George West terminal and perform tie in to ETC line coming through site.

执行工作
  • 制作和安装4870升.F. 管
  • 设置机械泵3台
  • Fabricated and installed firewater loop, fire water monitor, and firewater pump.
成就

Effectively completed project with no OSHA recordable incidents or lost time accidents.

挑战

Working with several other on-site contractors with limited space and limited resources.

能力:

老板: EF90
项目: 新的60英亩的坦克农场
工程师: 工程及码头服务
总承包商: 申博sunbet
项目类型: $ 5,800,000.00
总工时: 79,000
状态: 完整的

项目描述

Mirage was called in to assist with the Expansion of a new tank farm located on the Corpus Christi.

执行工作
  • 建造到60英亩的土地等级
  • 安装所有地下排水系统
  • 安装地下烈酒
  • 置换和安置了13,500吨普通填充物
  • 安装45个集水盆,以便排水
成就

有效完成项目,无可记录损伤.

挑战

Coordinating with existing land owner to remove 管 and 管 racks in phases.

能力:

老板: 台塑
项目: 分馏- II厂址发展和重型运输道路
承包机构地址 & 电话:
台塑
201年台湾开车
点安慰,TX
(361) 987-7000
数额: $1,623,000.00

项目描述

Mirage was contracted by formosa plastics to develop new fration ii plant grass roots project

执行工作
  • 运进,铺好,压实了24000吨石灰石地基
  • Hauled in spread and compacted 15,000 cubic yards of general fill
  • 石灰稳定40万平方.ft. 垫
  • 安装了2400英尺的6英尺的链环围栏
  • 排水管长度为700英尺
  • 18,000 sq. yd. 沉重的运输道路
关键的成就

完整的d in 60 calendar days so owner could start new expansion on schedule

挑战

调度与协调1,700 loads of material to come into a chemical plant with limited access.

能力:

老板: 台塑
项目: 25% IEM扩张
承包机构地址 & 电话:
台塑
201年台湾开车
点安慰,TX
(361) 987-7000
数额: $941,500.00

项目描述

MIRAGE WAS CONTRACTED BY 台塑 TO ERECT IEM EXPANSION BRINE EVAPORATOR STRUCTURE

执行工作
  • 架设570000磅钢结构
  • 安装了1100平方英尺的q - deck
  • 安装了6000平方英尺的镀锌格栅
  • 在el倾倒了35立方码.60
关键的成就
  • Effectively completed project with no OSHA recordable incidents or lost time accidents.
挑战
  • TYING NEW STEEL STRUCTURE INTO EXISTING STEEL STRUCTURE IN AN OPERATING PLANT WITHOUT DISTURBING PLANT OPERATIONS.